Laserfiche WebLink
04.CO <br /> COLORADO DIVISIC 'ION, MINING AND SAFETY <br /> ti 1313 Sherman Street,Ri TRO2 <br /> '0203 ph(303)866-3567 <br /> ' ACY/thm <br /> REQUEST FOR TECHi.._«_ _W . _. ___ . ,_ 1) COVER SHEET <br /> File No.: M- 2016-081 site Name:West Side Placer <br /> County IVI off at TR# (DRMS Use only) O <br /> AuPt Industries LLC � 0 <br /> Permittee. �. �rEA o O <br /> Operator(If Other than Permittee): C)cf as loll �, a <br /> 00 <br /> Peter Freedman <br /> Permittee Representative: nnn�11f1�l�� 1 � <br /> 1MMNhgI�8A�ETY 5. <br /> `n <br /> Please provide a brief description of the proposed revision: <br /> Update native seed mix and planting method. <br /> 0 <br /> Do <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application o O <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or = � IN) <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted + <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type lequired Tll Fee Submitted (mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials, and 112 quarries b='16 <br /> 112 hard rock (not DMO) �175 ❑ <br /> 110d, 112d(l, 2 or 3) S 1006 ❑ <br />