Laserfiche WebLink
September 26,2019 C-1982-056/Foidel Creek Mine TNL <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> Y -Air Resource Protection Y -Roads <br /> N -Availability of Records N -Reclamation Success <br /> N -Backfill&Grading N -Revegetation <br /> R -Excess Spoil and Dev.Waste N -Subsidence <br /> N -Explosives N -Slides and Other Damage <br /> N -Fish&Wildlife Y -Support Facilities On-site <br /> Y -Hydrologic Balance Y -Signs and Markers <br /> R -Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N -Other N - Special Categories Of Mining <br /> Y -Processing Waste Y -Topsoil <br /> COMMENTS <br /> This was a partial inspection of the Foidel Creek Mine;DRMS Permit No. C-1982-056, operated by Twentymile <br /> Coal,LLC. (TC). This inspection was conducted by Tabetha Lynch with the Colorado Division of Reclamation, <br /> Mining,and Safety(Division). Miranda Kawcak of TC accompanied the inspection. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> The old wash plant removed and the old thickener tank was in the in process of removal at the time of inspection. <br /> The foundation of the new screen building was in place and work to relocate the substation was occurring. The <br /> passive treatment system being constructed new the 61\4N reservoir was installing the inlet to the system at the <br /> time of inspection. Two of the Agri-drains had been installed in the ponds. Per the operator it is expected that the <br /> vegetation will be placed in first part of October.The location of inlet line of the passive treatment system was <br /> modified due to topography to avoid a low spot that had a freeze potential. Construction projects appear to be <br /> under construction per the approved plans. No issues were noted during this inspection. Ongoing maintence items <br /> are listed in the August complete inspection. <br /> DOCUMENTS RECEIVED <br /> OTHER(SPECIFY) <br /> PR 12 Wolf Creek Reserve LBA Development and Mining: Decision Due Date Extended to 12/20/2019 <br /> Number of Partial Inspection this Fiscal Year: 3 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 2 of 3 <br />