Laserfiche WebLink
ATTACHMENT B- 1 <br /> EARDON MINING INDUSTRY CONSULTANTS <br /> TEEL L LC 18050 COUNTY ROAD G •CORTEZ,CO 81321 •970.565.0278•MTeHEARDONSTEEL.US <br /> March 25,2012 <br /> Dustin Czapla <br /> Division of Reclamation,Mining and Safety <br /> 101 South 3rd, Suite 301 <br /> Grand Junction, CO 81501 <br /> RE: Technical Revision,May Day Idaho Mine Complex,Permit No.M-1981-185,Rescission of <br /> Milling Operations <br /> Dear Mr. Czapla, <br /> This letter comprises Wildcat Mining Corporation's(WMC) submittal of a Technical Revision(TR)to the <br /> May Day Idaho Mine Complex (Site), Permit No. M-1981-185 (Permit). This TR is intended to provide <br /> the Division of Reclamation Mining and Safety (Division) with formal notice that WMC is hereby <br /> rescinding its intentions to mill ores at the Site. All previous submittals and correspondence regarding <br /> milling operations at the Site are considered by WMC to be null and void. If at some point in the future <br /> WMC does desire to conduct milling operations at the Site, WMC will submit a technical revision or <br /> amendment to the Permit for approval to do so prior to constructing or conducting milling operations in <br /> the future. <br /> Activities associated with this TR are limited to WMC removing all milling equipment from the May Day <br /> No. 1 area during the working season of 2013. Equipment to be removed includes the following: <br /> • 1, 8"x 12" Quinn double jig • 2, 3 cell#15 flotation machines <br /> • 1,4" feed Cyclone • 1,4 cell#12 flotation machine <br /> • 2, 4'x 4'agitator/conditioner tanks • I,double deck concentrating table <br /> • 1,4'x 5' ball mill • 1, 3'x 3'concentrate filter <br /> The arched steel set building which currently contains the above listed equipment will remain on site and <br /> will serve as an equipment and supplies storage building for the foreseeable future. <br /> In the absence of milling operations, WMC's mining operation at the Site will generally consist of drilling <br /> and blasting of rock underground, transport of the blasted rock from the blast area to the surface, possibly <br /> intermittent crushing of the blasted rock to 3/4" to 1/4" inch minus,and transport of up to 30 tons per day <br /> of blasted or crushed rock off site to a permitted milling operation(s)elsewhere in North America. More <br /> specific details of WMC's anticipated mining activity will be addressed in a separate technical revision, <br /> which is anticipated to be submitted sometime this Spring season. <br /> Thank you for taking the time to review this information. If you have any questions or concerns, please <br /> do not hesitate to contact me(cell: 970-426-2924)or email (,: <br /> Sincerely; <br /> Mike Thompson <br /> PrincipaVReardon Steel I IC <br /> lie: Randy Oser, President/Wildcat Mining Corporation <br /> Page 1 of 1 <br /> R `i <br />