Laserfiche WebLink
M-2012-OSO <br /> September 9, 2019 <br /> Page 10 <br /> If both phase 3 and 4 will be reclaimed at the same time the worst case scenario will be increased. <br /> Please specify the updated acreages/volumes for; grading (additional LF of 1:1 backfill slope), <br /> overburden replacement, increased stockpile de-compaction,topsoil replacement, increased <br /> dryland and wetlands revegetation. Response: Phase 3 will not be mined until the <br /> completion of Phase 4. Concurrent reclamation and mining activities will occur as clarified <br /> in this response. Therefore the worst-case scenario has not been increased. <br /> Page 6 of 10 <br />