My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-01_REVISION - M1983194 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983194
>
2019-10-01_REVISION - M1983194 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:10:05 PM
Creation date
10/2/2019 11:47:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REVISION
Doc Date
10/1/2019
Doc Name
Request for Technical Revision
From
Natural Soda LLC
To
DRMS
Type & Sequence
TR44
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task#TTT Page 2 of 2 <br /> haul <br /> TR-36 Warehouse 400'x 150'x 22' Plant(1C)demo./off-site 1,320,000.00 CIF $0.79 $1,038,840.00 <br /> Building disposal in approved <br /> landfill-Max.30 mile <br /> haul <br /> TR-36 Removal of 101285 sq. ft, Demo.and on-site 101,285.00 SF $0.85 $86,396.11 <br /> concrete foundations disposal in excavated pit, <br /> 6 in. thick-Max.200 ft. <br /> push <br /> TR-36 Asphalt 133'x 182' Pavement,bituminous, 897.00 SY $7.00 $6,279.00 <br /> Parking Removal demolition only-4 in.to <br /> 6 in. thick <br /> Off Site removal of 12,103 CuFt Loading and 2 mile haul, 448.00 CY $17.20 $7,705.60 <br /> asphalt-Loading no salvage-Machine <br /> loading <br /> Off site removal of 448 CY @ 19 Hauling only,per mile, 473.00 MI $3.08 $1,456.84 <br /> asphalt-Hauling mi a trip 12-18 CY truck-50 mph <br /> average speed <br /> Off site removal of 448 CY Dump fees-Building 448.00 CY $11.10 $4,972.80 <br /> asphalt-dump fee construction materials. <br /> Demolition of 120'x 160'x 40' Plant(3S)demo./off-site 672,000.00 CF $469,056.00 <br /> Screening and Magnet disposal in approved <br /> System landfill-Max. 30 mile <br /> haul <br /> Pipelines averaged to 36,050 LF Pipe,steel,welded 36,050.00 LF $228,196.50 <br /> 10" diam connections- 10 in. <br /> diameter pipe <br /> Overhead Powerline 57 poles Utility Poles,Wood 35'- 57.00 EA $258.00 $14,706.00 <br /> Removal-Pole 45'high(each pole) <br /> Overhead Powerline 57 Arms Utility Pole Cross Arm 27.00 EA $93.00 $2,511.00 <br /> Removal-Cross Arms <br /> Disposal of Power 57 @ 45' Disposal of utility pole 2,565.00 LF $0.02 $51.30 <br /> Poles and hardware surplus <br /> material <br /> Disposal of Cross 57 @ 8 ft wide Disposal of utility pole 456.00 LF $0.01 $4.56 <br /> Arms each cross arms and hardware <br /> surplus material <br /> Total Cost <br /> Subtotal (adjusted for <br /> Job Hours: 160.00 (unadjusted): $5,347,064.31 location): $5,106,446.42 <br /> 9/30/2019 12:24:42 PM <br /> Highlight <br /> Reduce 01ajob hours to 80 hours. Rational: <br /> NS will not build out the plant expansion <br /> items (yellow highlight)which were proposed <br /> and bonded for in TR-36. <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.