Laserfiche WebLink
TR-44 Adjusted Reclamation Costs <br /> TR-44, Task 01A Line Items <br /> TR-44 TR-44 Volume/ Unit Unit TR-44, Task 01a <br /> Dimensions Area Cost Updated Costs <br /> NSI Plant 200' x 227' x 42.5' 1,929,500 CF 0.70 1,350,650.00 <br /> Product Storage Dome 95'x 95'x 50' 451,250 CF 0.70 315,875.00 <br /> Removal of NS Plant Slab 200' x 227' x 8" 45,400 SF 1.14 51,756.00 <br /> Removal of Storage Dome Slab 95'x 95'x 8" 9,025 SF 1.14 10,288.50 <br /> Scale Building 108' x 18' x 10' 19,440 CF 0.70 13,608.00 <br /> Removal of Scale Building Slab 18'x 108' x 8" 1,944 SF 0.85 1,652.40 <br /> Tank Farm 30'x 50' S ea 760.00 3,800.00 <br /> Removal of Flagpole/Monument 70 SF 5.00 350.00 <br /> Demolition of screening and magnet system 6'x 18' x 10' 1,080 CF 0.70 756.00 <br /> pipelines averaged to 10" diameter 35,198 35,198 LF 6.33 222,803.34 <br /> TR-44 Task 01a Total (unadj. for loc.): 1,971,539.24 <br /> TR-44,Task 01A Reclamation Cost Adjusted for Location (0.955): 1,882,819.97 <br /> TR-44 Task 01A Job Hours=80 hrs <br /> TR-44, Task 05a, b, & c Task TR-44, Task 05 <br /> Line items Hours Updated Costs <br /> Regrade Well Pads 165.77 69,178.00 <br /> Topsoil Well Pads 34.04 14,212.00 <br /> Reveg Well Pads 69.00 87,009.00 <br /> Daub &Associates, Inc. TR-44 Updates October 2019 <br />