My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-01_REVISION - M1983194 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983194
>
2019-10-01_REVISION - M1983194 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:10:05 PM
Creation date
10/2/2019 11:47:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REVISION
Doc Date
10/1/2019
Doc Name
Request for Technical Revision
From
Natural Soda LLC
To
DRMS
Type & Sequence
TR44
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#05B Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Topsoil Well Pads <br /> Site: Nahcolite Project Permit Action: TR-43 Permit/Job#: M1983194 <br /> PROJECT IDENTIFICATION <br /> Task#: 05B State: Colorado Abbreviation: None <br /> Date: 6/3/2019 County: Rio Blanco Filename: M194-05b <br /> User: ACY <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat 138T-8SU <br /> Horsepower: 310 9/30/2019 12:26:22 PM <br /> Blade Type: Semi-Universal Highlight <br /> Attachment: NA <br /> Shift Basis: 1 per day Recalculate Task 05b cost & hours using 46 <br /> Data Source: (CRG) acres (see D&A Reclamation spreadsheet). <br /> Cost Breakdown: Rationale: Well pads which are undergoing <br /> final reclamation have had topsoil replaced. <br /> Ownership Cost/Hour: $93.62 <br /> Operating Cost/Hour: $73.35 <br /> Ripper own.Cost/Hour: $0.00 <br /> Ripper op.Cost/Hour: $0.00 <br /> Operator Cost/Hour: $41.52 NA <br /> Total unit Cost/Hour: $208.49 <br /> Total Fleet Cost/Hour: $416.99 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 39,527 <br /> Swell factor: 1.000 <br /> Loose volume: 39,527 LCY <br /> Source of estimated volume: 49 ac @ 6"depth <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 150 feet <br /> Unadjusted hourly production: 634.3 LCY/hr <br /> Materials consistency description: Loose stockpile 1.2 <br /> Average push gradient: 0% <br /> Average site altitude: 6,600 feet <br /> Material weight: 1,600 lbs/LCY <br /> Weight description: Top Soil <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 AVG. <br /> Material consistency: 1.200 CAT HB <br /> Dozing method: 1.000 GEN. <br /> Visibility: 1.000 AVG. <br />
The URL can be used to link to this page
Your browser does not support the video tag.