My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-01_REVISION - M1983194 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983194
>
2019-10-01_REVISION - M1983194 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:10:05 PM
Creation date
10/2/2019 11:47:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REVISION
Doc Date
10/1/2019
Doc Name
Request for Technical Revision
From
Natural Soda LLC
To
DRMS
Type & Sequence
TR44
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OE COO <br /> * COLORADO DIMS TR44 LMATION, MINING AND SAFETY <br /> * " 1313 Sherman Stree lorado 80203 ph(303)866-3567 <br /> 11976 <br /> ACYlthm / ((�✓ <br /> 41 <br /> REQUEST FOR TECHNICAL REVISION(TR) COVER SHEET <br /> File No.: M_ 1983-194 site Name: Natural Soda Nahcolite Project <br /> Rio Blanco RECEIVED <br /> County TR# (DBMS Use only) <br /> Permittee: Natural Soda LLC OCT o 1 201 <br /> DMSION OF RECLAMATION <br /> Operator(If Other than Permittee): MINING AND SAFETY <br /> PermitteeRepresentative: Gerald Daub, Daub & Associates, Inc. o ic <br /> �; n !, <br /> Please provide a brief description of the proposed revision: o ° �p <br /> 3 <br /> Natural Soda LLC requests a surety reduction relating to reclaimed acreage and a proposed plant expansior�-°, W <br /> CD � <br /> which was bonded for JR-36) but has been subsequently canceled, see attached documentation. �p <br /> o �• <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TP o <br /> the Division may require the submittal of a permit amendment to make the required or desired changes C <br /> Da <br /> to the permit. n — <br /> � o � <br /> The request for a TR is not considered "filed for review" until the appropriate fee is received by the -p <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to 5— <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 11 Oc, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> I IOd, 112d(l, 2 or 3) $1006 ✓© <br />
The URL can be used to link to this page
Your browser does not support the video tag.