My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-02_HYDROLOGY - M2007044
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2007044
>
2019-10-02_HYDROLOGY - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 8:27:13 AM
Creation date
10/2/2019 11:47:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
HYDROLOGY
Doc Date
10/2/2019
Doc Name
Water Level Monitoring
From
Energy Fuels
To
DRMS
Annual Report Year
2019
Report Quarter_Month
3
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lumsden Cannon Seep <br /> The Lumsden Canyon Seep (also referred to in earlier reports as Lumsden Canyon Spring) was <br /> monitored for field parameters and sampled in June and December of 2008. This location was <br /> monitored by Western Water & Land, Inc. during hydrologic reconnaissance required by BLM <br /> stipulations to the Plan of Operations. No further sampling or field parameter measurement <br /> events are scheduled at this time. <br /> Historical field parameters are summarized in Appendix 1, Attachment 7 and the historical <br /> analytical data from the Lumsden Canyon Seep samples are summarized in Appendix 2,Table 4. <br /> Rajah 49 Thornton Portal (Rajah Spring) <br /> The Rajah Spring has been sampled annually from 2009 to 2019. Field parameters and a sample <br /> were collected on September 13, 2019 during the 2019 Seeps and Springs Survey. The Annual <br /> Seeps and Springs Survey notes and photo log are included in the second quarter 2019 report. <br /> The analytical laboratory reported QC issues during the analysis of the 2019 Whirlwind samples, <br /> and the samples had to be reanalyzed. The reanalysis delayed the delivery of the data, and the <br /> analytical data were not available at the time of the second quarter 2019 report. The analytical <br /> data from the second quarter 2019 sampling event are included with this report. <br /> The estimated flow rate and measured field parameters are included in Appendix 1, Attachment <br /> 8 of this report, and the analytical data are summarized in Appendix 2, Table 5. <br /> Waste Rock <br /> No ore was mined and no waste rock was produced in the third quarter 2019. The Mine is <br /> currently in temporary cessation status with only maintenance and monitoring activities being <br /> conducted. EFRI has suspended the quarterly waste rock sample collection until such time that <br /> mining operations resume and waste rock removal from the Mine recommences. <br /> Production rates of ore and waste rock are summarized in Appendix 1, Attachments 9 and 10, <br /> respectively. Analytical data from previously collected waste rock samples are summarized in <br /> Appendix 2,Table 6. <br /> Sediment Pond <br /> The sediment pond has been monitored since its construction in November 2008 in accordance <br /> with the Colorado Division of Reclamation, Mining, and Safety stipulations. Although storm <br /> events and significant snow melt events have occurred, none have resulted in stormwater <br /> discharge from the pond. As a result, no stormwater samples have been collected from the pond <br /> to date. EFRI will continue to monitor the sediment pond for discharge and will collect samples <br /> in the event that a discharge is observed. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.