Laserfiche WebLink
7a42. The Board may suspend or revoke this permit,or assess a civil penalty,upon a finding that the petmittee <br /> violated the terms or conditions of this permit,the Act,the Mineral Rules and Regulations,or that information <br /> contained in the application or your permit misrepresent important material facts; <br /> 19�9j3. If your mining and reclamation operations affect areas beyond the boundaries of an approved permit <br /> boundary,substantial civil penalties,to you as perrnittee can result; <br /> IeA2 4. Any modification to ft approved training and reclamation plan From those described in your appoved <br /> ication rewires you to submit a permit modification and obtain approval from the Bogard or Office; <br /> —6 . It is your responsibility to notify the Office of any changes in your address or phone number; <br /> kp�6. Upon permit issuance ami prior to beginning on-site mining activity,you most post a sign at the entrance of <br /> the mine site,which shall be clearly visible frratn the access road,with the following information(Rule 3.1.12): <br /> a. the name of the operator, <br /> b. a statement that a reclamation permit for the operation has been issued by the Colorado Mined Land <br /> Reclamation Board,and, <br /> c, the permit number. <br /> za <br /> The boundaries of the permit boundaryarea must be marked b monuments or other markets that are clearly <br /> Y y <br /> visible and adequate to delineate such boundaries prior to site disturbance. <br /> "too;:41 - It is a provision of this permit that the operations will be conducted in accordance with the terms and <br /> conditions listed in your application,as well as with the provisions ofthe Act and the Construction Material Rules <br /> and Regulations in effect at the time the permit is issued. <br /> 199V9. Annually,on the anniversary date of permit issues,you must submit an annual fee as specified by Statute, <br /> and an annual report which includes a map describing"acreage affected and the acreage reclaimed to date(if <br /> there are changes from the previous year),any monitoring required by the Reclamation Plan to be submitted <br /> annually on the anniversary date of the permit approval. Annual fees are for the previous year a permit is held. For <br /> example,a permit with the anniversary bate ofJuly 1. 1995,the annual fee is for the period of July 1,1994 trough <br /> June 30. 1995. Failure to submit your annual fee and report by the permit arunive nary date may result in a civil <br /> penalty, revocation of your permit, and forfeiture of your financial warranty. It is your responsibility, as the <br /> permittee,to continue to pay your annual fee to the 01&*until the Board releases you from your total reclamation <br /> responsibility. <br /> 3 <br /> iV a 10. For Joint venture4mdaner Wp orreratz .the signing representative Is autborized to sign this document and a <br /> power of attorney(provided by the pwtner(s))audwri ft the signature of the representative is aftcliad to this <br /> application. <br />