My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-30_REVISION - M1988108
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988108
>
2019-09-30_REVISION - M1988108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 4:29:33 AM
Creation date
10/1/2019 1:47:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988108
IBM Index Class Name
REVISION
Doc Date
9/30/2019
Doc Name
Adequacy Review Response #3
From
Arcosa Lightweight
To
DRMS
Type & Sequence
AM3
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARcosa <br /> numbers (e.g., 6"-12" of topsoil) rather than specific figures. <br /> (2) The Reclamation Plan shall include provisions for, or satisfactory explanation of, all general <br /> requirements for the type of reclamation proposed to be implemented by you. Reclamation shall <br /> be required on all the affected land. The Reclamation Plans shall include: <br /> (a)A description of the types) of reclamation you propose to achieve in the reclamation <br /> of the affected land, why each was chosen, the amount of acreage accorded to each, <br /> and a general discussion of methods of reclamation as related to the mechanics of <br /> earthmoving; <br /> (b)A comparison of the proposed post-mining land use to other land uses in the vicinity <br /> and to adopted state and local land use plans and programs. In those instances where <br /> the post-mining land use is for industrial, residential, or commercial purposes and such <br /> use is not reasonably assured, a plan for revegetation shall be submitted. Appropriate <br /> evidence supporting such reasonable assurance shall be submitted; <br /> (c)A description of how the Reclamation Plan will be implemented to meet each <br /> applicable requirement of Section 3.1; <br /> (d)Where applicable, plans for topsoil segregation, preservation, and replacement; for <br /> stabilization, compaction, and grading of spoil; and for revegetation. The revegetation_ <br /> plan shall contain a list of the preferred species of grass, legumes, forbs, shrubs or trees <br /> to be planted, the method and rates of seeding and planting, the estimated availability <br /> of viable seeds in sufficient quantities of the species proposed to be used, and the <br /> proposed time of seeding and planting; <br /> (e)A plan or schedule indicating how and when reclamation will be implemented. Such <br /> plan or schedule shall not be tied to any specific date but shall be tied to <br /> implementation or completion of different stages of the mining operation as described <br /> in Subparagraph 6.4.4(1)(e). The plan or schedule shall include: <br /> (i)An estimate of the periods of time which will be required for the various stages <br /> or phases of reclamation; <br /> (ii)A description of the size and location of each area to be reclaimed during each <br /> phase;and <br /> (iii) An outline of the sequence in which each stage or phase of reclamation will <br /> be carried out. (The schedule need not be separate and distinct from the <br /> Reclamation Plan, but may be incorporated therein.) <br /> (fl A description of each of the following_ <br /> (i) Final grading - specify maximum anticipated slope gradient or expected ranges <br /> thereof, <br /> (ii) Seeding - specify types, mixtures, quantities, and expected time(s) of seeding <br /> and planting <br /> (iii)Fertilization - if applicable, specify types, mixtures, quantities and time of <br /> application; <br /> (iv)Revegetation - specify types of trees, shrubs, etc., quantities, size and location; <br />
The URL can be used to link to this page
Your browser does not support the video tag.