My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-01_REVISION - M2019028
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2019028
>
2019-10-01_REVISION - M2019028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:09:55 PM
Creation date
10/1/2019 1:15:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019028
IBM Index Class Name
REVISION
Doc Date
10/1/2019
Doc Name
Adequacy Review Response #2
From
J & T Consulting
To
DRMS
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE: J-2 Contracting Company-DPG Pit-Permit No. M-2019-028 <br /> 112(c) Permit Application <br /> Adequacy Review No. 2 Response 9/27/19 <br /> -2- <br /> with them on Wednesday, September 26'h, and they indicated that all of the areas within <br /> the mining phases were non jurisdictional. Nick Franke with the Army Corps of <br /> Engineers will be putting together the formal response and should be sending that to us <br /> by mid-October. As soon as we have the formal response we will provide it to the DRMS. <br /> J-2 Contracting commits to not mining any of the areas that are being reviewed by the <br /> Army Corps of Engineers until we have their formal response for the determination. <br /> Exhibit L -Reclamation Costs (Rule 6.4.12): <br /> 4) The operator's response to item no. 28 states that costs to reclaim the buried dewatering <br /> pip to extend from the recharge pond to the river have been included in the revised Exhibit <br /> L bond calculation. However, the Division could not find costs for this item in the revised <br /> bond estimate provided. Please be sure the bond estimate includes costs to reclaim the <br /> dewatering pipe. Response: The costs to reclaim the dewatering pipe are now <br /> included in the revised bond estimate. Please see the attached bond estimate. <br /> 5) The Division accepts the operator's proposal to submit a combination of dedicated water <br /> shares and $150,000 to cover administrative costs for converting the water shares to <br /> augmentation use in lieu of submitting 100% of costs for installing the Phase 1 slurry wall. <br /> This unique bonding approach only applies to Phase 1 mining. Therefore, prior to opening <br /> up Phase 2, the operator must submit a Technical Revision to increase the maximum <br /> disturbed area and to re-evaluate the required financial warranty accordingly. If, at that <br /> time, the operator can provide a letter from the State Engineer's Office approving the <br /> Phase 1 and 2 slurry wall enclosure, then the operator would be required to post 20% of <br /> total installation costs for that enclosure, and the dedicated water shares will no longer be <br /> necessary. Please be advised, upon application approval, the operator would have one <br /> calendar year to submit the affidavit for dedicated water shares along with the required <br /> financial warranty to receive permit issuance. <br /> Response: No response required. <br /> Exhibit S - Permanent Man-made Structures (Rule 6.4.191: <br /> 6) The operator's response to item no. 53 states the certified mail receipts (showing structure <br /> agreements were attempted for all owners of structures located within 200 feet of the <br /> proposed affected land boundary), were sent along with the letters to match the receipts in <br /> response to the Division's July 12, 2019 email. The Division has reviewed the materials <br /> submitted and has the following comments: <br /> a. The operator has provided a copy of the Certified Mail Receipt and the proof of <br /> notice to all owners of record of the affected land and the owners of record of all land <br /> surface within 200 feet of the affected land boundary for PDC Energy, Inc. However, <br /> the Division could not find a copy of the structure agreement mailed to this entity. <br /> Please provide a copy of the structure agreement that was mailed to PDC Energy, <br /> Inc. <br /> b. The operator has provided a copy of the Certified Mail Receipt and the proof of <br /> notice to all owners of record of the affected land and the owners of record of all land <br /> surface within 200 feet of the affected land boundary for Kerr-McGee Oil & Gas <br /> Onshore LP. However, the Division could not find a copy of the structure agreement <br /> mailed to this entity. Please provide a copy of the structure agreement that was <br /> 4r, 305 Denver Avenue—Suite D•Fort Lupton CO 80621 •Ph: 303-857-6222•Fax: 303-857-6224 <br />
The URL can be used to link to this page
Your browser does not support the video tag.