My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-26_INSPECTION - C1981022
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981022
>
2019-09-26_INSPECTION - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:30:27 AM
Creation date
9/27/2019 7:19:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Inspection
Doc Date
9/26/2019
Doc Name
Inspection Report
From
Oxbow Mining, LLC
To
DRMS
Inspection Date
9/26/2019
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 26,2019 C-1981-022/Elk Creek Mine LDS <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection N -Roads <br /> N -Availability of Records N -Reclamation Success <br /> N -Backfill&Grading N -Revegetation <br /> N -Excess Spoil and Dev. Waste N - Subsidence <br /> N -Explosives N - Slides and Other Damage <br /> N -Fish&Wildlife R - Support Facilities On-site <br /> R -Hydrologic Balance R - Signs and Markers <br /> R - Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N - Other N - Special Categories Of Mining <br /> N -Processing Waste N -Topsoil <br /> COMMENTS <br /> This was a partial inspection by Leigh Simmons of the Division of Reclamation,Mining and Safety <br /> (Division). Doug Smith of Oxbow Mining accompanied the inspection. The weather was clear and dry. <br /> The status of the Elk Creek Mine is"active"however no coal is being mined and the only activity since the last <br /> inspection was site maintenance. <br /> HYDROLOGIC BALANCE-Rule 4.05 <br /> Drainage Control 4.05.1,4.05.2,4.05.3; Siltation Structures 4.05.5,4.05.6; Discharge Structures 4.05.7,4.05.10; <br /> Diversions 4.05.4;Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br /> Drainage—Acid and Toxic Materials 4.05.8; Impoundments 4.05.6,4.05.9; Stream Buffer Zones 4.05.18: <br /> Oxbow had done work to maintain ditches around the main facilities area, and had made repairs to the Elk <br /> Creek stream channel. The channel was dry at the time of the inspection. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> Considerable equipment and material belonging to the Union Pacific railroad company were still on and <br /> adjacent to the railroad tracks within the mine permit boundary. <br /> SUPPORT FACILITIES-Rule 4.04: <br /> At the time of the inspection Oxbow staff were engaged on installing new equipment at the water <br /> treatment facility,with the aim of reducing the tri-halo methane content of the treated water. <br /> SIGNS AND MARKERS—Rule 4.02: <br /> Mine ID signs were in place at the mine entrance,as well as at intersections of the mine permit boundary <br /> with the highway. <br /> DOCUMENTS RECEIVED <br /> N/A <br /> Number of Partial Inspection this Fiscal Year: 2 <br /> Number of Complete Inspections this Fiscal Year: I <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.