My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-26_REVISION - M1973021
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
2019-09-26_REVISION - M1973021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:09:20 PM
Creation date
9/26/2019 12:45:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
REVISION
Doc Date
9/26/2019
Doc Name
Request for Technical Revision
From
Aggregate Industries
To
DRMS
Type & Sequence
TR6
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR06 <br /> ECS/mac <br /> Consultants <br /> September 18, 2019 3918kyjall � <br /> Consulting Project No. 1705051 KIMLo Lot) <br /> Engineers and r� <br /> Scientists ��f � ��'�� <br /> Mr. Eric Scott, P.G., R G. OMS�ON 0F REC <br /> Colorado DRMS �NGANC �� � <br /> 1313 Sherman St., Room 215 A o <br /> Denver, CO 80203 s 3 <br /> Re: Morrison Quarry; a <br /> Quar DRMS File M-1973-021-Technical Revision � ' w <br /> 0 <br /> N N <br /> Dear Mr. Scott: <br /> On behalf of Aggregate Industries(Al), GEI Consultants, Inc. (GEI)is submitting this <br /> Technical Revision(TR)to the Colorado Division of Reclamation Mining and Safety <br /> (DRMS) 112 Construction Materials Reclamation Permit M-1973-021. This TR presents <br /> the preferred locations and design for the required groundwater monitoring wells (MW's) <br /> to be installed within the South Quarry of the Morrison Quarry. <br /> INTRODUCTION ry <br /> m o '� <br /> As part of the 2018 M-1973-021 AM-06 Adequacy Review, the Colorado Office of the y I� <br /> State Engineer(SEO) is requiring Al to install MW's. The SEO provided the following <br /> comment in their review: "because it can be difficult to tell the source of water in an <br /> excavation, this office requests that the applicant be required to install piezometers around <br /> the South Quarry to measure the groundwater level and demonstrate that the excavation is <br /> not exposing groundwater" (SEO, October 2018). <br /> In discussions with the DRMS, GEI has confirmed that a total of 3 MW's will be required <br /> to develop adequate groundwater data for monitoring purposes. <br /> PROPOSED MONITORING WELL LOCATIONS <br /> GEI has selected the proposed locations(shown in Figure 2) for the MW's. Installation of <br /> the MW's in these areas is intended to meet the following objectives: <br /> • Install the MW's in locations where they will not interfere with ongoing mine <br /> activities during installation or monitoring [Operations]. <br /> • Placed in locations to minimize the risk relating to rockfall hazards for personnel <br /> during installation and monitoring [Safety] <br /> • Installed where they will not be damaged or destroyed during ongoing and future <br /> mine blasting operations. Damaged or destroyed MW's would require re- <br /> installation at significant expense to AI [Longevity]. <br /> www.aeiconsultants.com GEI Consultants,Inc. <br /> 2625 Redwing Road,Suite 370,Fort Collins,CO 80526 <br /> 970.224.7342 fax:303.662.8757 <br />
The URL can be used to link to this page
Your browser does not support the video tag.