Laserfiche WebLink
R ".'O"EIVED <br /> SEP 2 5 2019 <br /> TRAPPER MINING INC. <br /> 11'.;. '7NOFRECLAMATION CRAIG, COLORADO <br /> ..AINGAND SAFETY <br /> HORSE GULCH FILL <br /> QUARTERLY FILL CERTIFICATION <br /> I, Tonia Marie Perkins, a Licensed Professional Engineer in the State of Colorado, in <br /> accordance with 2CCR407-2, Section 4.09.1(11), have conducted a quarterly inspection of the <br /> Horse Gulch Fill construction. This quarterly inspection was conducted on September 18, 2019. <br /> The fill was inspected for stability, and no appearance of instability, structural weakness, or <br /> other hazardous condition was observed during the inspection. Construction during this quarter <br /> has been under my supervision, and to the best of my knowledge and belief, has been <br /> consistent with the design approved by the Colorado Division of Reclamation, Mining, and <br /> Safety. <br /> OftlJl/I <br /> A . <br /> V :Q- cSA:Fp <br /> 43864 �;Q_ <br /> Tonia Marie Perkins � pO••• <br /> CO PE 43864 '%,F '••.•„•..•'�Z,o` <br /> sSZONIAI``t�� <br /> 9//4Z <br /> Dat <br />