Laserfiche WebLink
RECEIVED <br /> SEP 2 4 2019 <br /> DY"of RECUKAT N <br /> MWWAW&VM <br /> Western Slope Flagstaff Quarry No. 2 <br /> Irrigation Pipeline & Ditch Lateral <br /> Removal Project <br /> RECLAMATION PLAN <br /> �a <br /> Prepared for: <br /> Mr. Rudy Fontanari <br /> Western Slope Flagstone <br /> 3316 E % Road <br /> Clifton, Colorado 81520 <br /> Date: September 2019 <br /> Prepared By: <br /> Fox Engineering Solutions, Inc. <br /> P.O. Box 413, <br /> Fruita, CO 81521 <br /> Ph:(970)250-5505 <br /> Email:coloradofox(a)bresnan.net <br />