Laserfiche WebLink
-4- <br /> 12. Primary future(Post-mining)land use(check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> ✓ Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary present land use(check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Scrapers,a Dozer and front end loaders remove material and take to plant. <br /> 15. On Site Processing: ✓ Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): Processing takes place to build a large inventory of material.The stockpiled <br /> material is hauled from the site as needed. The processing plant is moved to a another mine until the stockpiles need replenishing. <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> None <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> This ammendment is to add 15.65 acres and simplifies the permit boundary. Most of the increase is to add a <br /> Special 112 Permit area to the 112 permit and eventually release the 111 permit. The mine limits will be <br /> expanded on the north, and south sides. Method of operations and reclamation will remain unchanged. <br /> Stockpiles will be built and material hauled as needed. <br />