My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-24_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2019-09-24_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2019 10:28:41 AM
Creation date
9/24/2019 9:45:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
9/24/2019
Doc Name
Application
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR121
Email Name
RDZ
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br /> J. E. STOVER & ASSOCIATES, INC. <br /> 2352 NORTH 7T"STREET,UNIT B <br /> GRAND JUNCTION,COLORADO 81501 <br /> PHONE:(970)245-4101,FAX:(970)242-7908 <br /> MINE ENGINEERING CIVIL ENGINEERING <br /> MINE RECLAMATION CONST. MANAGEMENT <br /> September 19, 2019 <br /> Rob Zuber EC"'#6EIVED <br /> Division of Reclamation, Mining &Safety <br /> 1313 Sherman St., Room 215 SEP 2 4 2019 <br /> Denver, CO 80203 <br /> DIVISION OF RECLAMATION <br /> Re: Bowie Resources, LLC, Bowie No. 2 Mine MINING AND SAFETY <br /> TR-121, Revise Water Monitoring Frequency <br /> Permit C-1996-083 <br /> Dear Mr. Zuber: <br /> On behalf of Bowie Resources, LLC, (BRL), enclosed is an application for a technical revision to <br /> reduce the frequency of monitoring the drill holes from quarterly to annually. The quality of <br /> the water and depth to water in the drill holes is fairly consistent. BRL believes annual <br /> monitoring is a suitable monitoring schedule during the time the mine is not in operation. <br /> The revised schedule is described in the last two sentences in the fourth paragraph on page <br /> 124. A minor change was made on page 126. The fifth line in paragraph two was amended to <br /> state that the real time data would not be collected during periods when the mine is not in <br /> operation. <br /> Please let me know if you have any additional questions. <br /> Sincerely, <br /> Tao IA v 13W--OYy <br /> Tamme Bishop, P.E. <br /> Project Engineer <br /> Cc: Basil Bear <br />
The URL can be used to link to this page
Your browser does not support the video tag.