Laserfiche WebLink
were also evaluated for Phase II bond release. As with EP058, no issues were noted and <br /> conditions were as described in the SL-16 application. See Figures 4 and 5. Verification of <br /> topsoil placement is also conducted by the Division during Phase II bond release. 13 topsoil <br /> verification holes across parcels EP058, ST002, and ST003 were dug and measured by the <br /> DRMS inspector prior to/in preparation for this inspection. Those measurements are included in <br /> the Division inspector's August 14, 2019 report and indicate the permittee is in compliance with <br /> the conditions of its approved reclamation plan. <br /> The Team's last stop was at the Gulch A Pond which has been approved by the Division as a <br /> permanent feature in support of the PMLU. The pond was stable, well-vegetated, and no <br /> evidence of erosion or sedimentation was noted. See Figure 6. <br /> Conclusion <br /> Reclamation parcels EP058, ST002, and STOW, in addition to the permanently retained East <br /> Side Collection Ditch and Gulch A Pond evaluated for bond release during this inspection <br /> comport with the permittee's approved reclamation plan and support the postmining land use. <br /> Bond release as applied for under SL-16 (to exclude parcel ST001) is recommended. No <br /> enforcement actions were taken as a result of this inspection, nor are any pending. <br /> Photos—> <br /> I' r <br /> , r <br /> ,; , ." ..a r 's� Y'.A•�,rv.11t ���r! ,I..rM rP ''� <br /> i r <br /> h, <br /> , 7 L <br /> I <br /> I I, <br /> I II <br /> , <br /> , <br /> {Y <br /> I'r pl}j <br /> ..$e A•,:''!dp. }..�f Y.I.r 14'tl::.,,,: ..1,.. ,r�sr tl � <br /> .;,,F )I� <br /> M�y�ylf <br /> r,. <br /> f -S l P J I YY�F <br /> qq x f + I, S yy L�i �yyAf�I 7I S 5 <br /> r�;}'2��i$ri'��.d�kPl hd I�FY�{ i•J�I y]� P �' 14 I iY"i .i rr. �.�YI,4iy�,'S' � J,"r' '�I. +ly '+�.I�1 I�f ejI`4I I; <br /> I:, l..i :'a'afl+ <br /> 1 r•�,�,'A -r. �r t" ,A i,� .i':�r _�..�� .i�.'�{ I r�T'=y`. � "�.l4 l� ;r+ ��{ � ,.�,•.P,,t r.ii,'-µ,.,�I,.a „�I ,^, .."'#. <br /> p , <br /> ��N �r� <br /> ..t'I 4',(.# <br /> •i Fw J.. .}., <ti. � �. ���..�7 t• P '';� 'r, I �r�y <br /> .�14g, <br /> !.� rlr s l I •x .rl i� .� Iyy � " '� '�.�+u <br /> Figure 1. East Side Collection Ditch. <br /> 3 1 P a g e <br />