My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-18_REVISION - M2004044
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004044
>
2019-09-18_REVISION - M2004044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 3:57:54 AM
Creation date
9/18/2019 4:53:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004044
IBM Index Class Name
Revision
Doc Date
9/18/2019
Doc Name
Adequacy Review Response #2
From
Aggregate Industries
To
DRMS
Type & Sequence
AM1
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
stockpiles are located in areas where alterations are not expected to impact the flood water surface elevations,their <br /> orientation and length are not restricted such as the stockpiles in active flow areas. A schematic figure <br /> demonstrating the ineffective flow areas around a bridge is presented below. <br /> Cross Section <br /> Contracting Flow �/!. Cross Section <br /> - -- — ross Section <br /> / Ineffective <br /> J Flow Area <br /> (Typical All <br /> Shaded <br /> ' Expanding Flow1w Areas) <br /> / •' , <br /> 1,:Cross Section <br /> ---- -- G <br /> Additional mining and reclamation procedures will be used within the regulatory floodplain to mitigate impacts from <br /> potential flood flows. Flood season is considered to be April 1 through September 30. The southern and eastern <br /> slopes of each area will either be maintained at 31-1:1 V during the flood season during mining or concurrently <br /> reclaimed at 31-1:1 V with reclamation backfill. This restriction only applies for areas within 400 feet of the South Platte <br /> River in accordance with DRMS policy. If flood waters reach the mining Areas prior to complete reclamation,the <br /> 31-1:1 V slopes will allow controlled flow into the Areas while reducing the potential for head cutting and capture of the <br /> South Platte River. <br /> A Floodplain Use Application has been issued by Adams County for this project. Adams County is the regulating <br /> authority on the flood permit; however,Adams County may request review and comment from Urban Drainage and <br /> Flood Control District(UD&FCD). Comments and revisions from the County or the UDFCD will be incorporated into <br /> the final Floodplain Use Permit. <br /> Each aspect of the mining operation is listed in the following table with associated disturbed area. The table <br /> illustrates a point in time when the mining disturbance could be at its maximum. At the proposed Tucson South <br /> Resource site, it is assumed that the mining disturbance will be at its greatest when the East Area mining is nearly <br /> complete. That will be a time when the slurry wall is installed and,topsoil replacement and initial seeding will be <br /> completed for the South and West Areas. <br /> Mine Operation Aspects and Disturbance Areas <br /> Aggregate Industries Tucson South Resource <br /> Permit#M-2004-044 112 Permit Amendment <br /> Page D-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.