Laserfiche WebLink
Table D-1. Mine Phase Areas <br /> Phase# Area (acres) <br /> 1 20.2 <br /> 2 20.2 <br /> 3 21.4 <br /> 4 20.6 <br /> on <br /> 6 19.7 <br /> 7 21.1 <br /> 8 24.9 <br /> 9 20.7 <br /> 10 20.4 <br /> 11 19.8 <br /> 12 20.2 <br /> 13 20.4 <br /> 14 20.3 <br /> 15 16.7 <br /> 16 23.0 <br /> 17 24.5 <br /> Raw blasted basalt material will be loaded into a portable crusher/screen plant where various <br /> sizes of product will be created and sorted into separate size-dependent stockpiles. Maximum <br /> processing is approximately 5,000 tons per day. The crushing operation and processed stockpile <br /> locations may change during the mine's life as mining proceeds across the mining area. <br /> Large boulders may be recovered from around the highwall of the undisturbed mesa. Boulders <br /> will be recovered using heavy equipment traveling cross county until the haul road is met. There <br /> will be no surface disturbance excepting the careful removal of individual boulders. <br /> Bradford Mesa Quarry <br /> August 2019 D-6 <br />