Laserfiche WebLink
11)(Optional) Please provide additional information about the Reclamation Plan: <br /> specific area that we intend to dig. Line Them up so we know the order and where. I hen we 44ie plan is to repair the disturbance as best we can, even to the extent of using the same grass that <br /> hole placing the dirt removed to only one side ot the hole. We will actually put each shovel u ac <br /> into the hole at approximately the same level we found it,simply because we can only use the last soil <br /> removed (on top the pile which would have come from the bottom of the hole), search for Peridot, <br /> and let the dirt fall back into the hole we iust dug Then we replace the original grasses in their <br /> designated In aces spread and rake in additional sepd.,and pack it down <br /> Typieally each hele will be dug and filled befer-e a anotheFhele is staFted. In this fashien we will have <br /> e are expecting and extremely small amount of Pendoto actually e removed from the site. am, <br /> we areafter only those stones that could be used for cutting. The small fragments that exist on t e <br /> surface today will continue to exist for future generations to find in time. <br />