Laserfiche WebLink
EXHIBIT D-Reclamation Plan <br /> Rule 6.3.4(Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E-Map. <br /> 1) Primary future(Post-mining) land use(check one): <br /> Cropland(CR) F Pastureland(PL) General Agriculture (GA) <br /> Rangeland(RL) Forestry(FR) Ja Wildlife Habitat(WL) <br /> Residential (RS) Recreation(RC) -a Industrial/Commercial(IC) <br /> 2) Please provide a general description of how the mined area will be Reclaimed: <br /> Please see comments provided in Exhibit C-Question 17,and Question 11 of this Section and <br /> elsewhere in this application. Just needed more space than what's available here. <br /> 3) What will the final grade of the reclaimed slopes(Horizontal:Vertical): H: V <br /> (Note: If the Applicant proposes slopes steeper than 3H: 1 V(example 1 H:1 V,2H: 1 V,etc.),please <br /> include a justification: <br /> Please see the Mine Plan Map for elevation points. The area is nearly flat and will remain that way. <br /> Thprp is a 1 -7 font difference in altitude hptwppn Pnints A,R, r R D_ Sinop nr grade is+1-_4�0 <br /> a. Please provide a general description of the backfilling and grading: *t' <br /> We'll use the same long handle shovels to replace the dirt and tong-handle rakes to buyr the grass <br /> gped_ Thpn romprecs it hit_ <br /> 4) De th of topsoil to be salvaged (only for surface disturbances)(check one): <br /> 4-6 inches 6-8 inches <br /> 8-10 inches 10-12 inches <br /> Other: <br /> N/A,explain: T-h*s is unknown at this time. I'm guessing about 18"on aveFage. All ef it will be <br /> rpnlacpd in the hole it came from_ No waste nr unused topsoil_ <br />