Laserfiche WebLink
16)Please provide an estimate of the actual costs to reclaim the site based on what it would <br /> cost the State of Colorado using an independent contractor to complete reclamation. The <br /> Office adds up to an additional maximum eighteen and one half(18.5%)percent of that <br /> total,which includes a private contract,typical overhead costs and profit. <br /> Direct Cost: <br /> i. Backfilling: - 767 (cubic yards)X$ 1 (cost per yard)=Total$ <br /> ii. Grading: 7i� (cubic yards)X$ (cost per yard)=Total$ AI;V <br /> iii. Topsoil: (cubic yards)X$ (cost per yard)=Total$ <br /> iv. Seeding: 03 (acres)X$ (cost per acre)=Total$ zS, <br /> v. Mobilization: (Pieces of equipment)X$ (cost per equipment)_ <br /> Total$ / 1 S� <br /> Direct Cost Subtotal: $ 71�9 <br /> Division's total overhead cost: X 18.5% <br /> Division's Total cost: $ SfOy <br /> Note: Based on the Division's experience the required financial warranty is normally set at <br /> approximately$2,500 per acre. Therefore,a typical 5 acre permit will have a total required financial <br /> warranty in the amount of$12,500. <br />