My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-18_PERMIT FILE - M2019050 (6)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019050
>
2019-09-18_PERMIT FILE - M2019050 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 3:52:04 AM
Creation date
9/18/2019 3:54:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019050
IBM Index Class Name
Permit File
Doc Date
9/18/2019
Doc Name
Application
From
Robert & Lauren Berry
To
DRMS
Email Name
ERR
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D-Reclamation Plan <br /> Rule 6.3.4(Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E-Map. <br /> 1) Primary future(Post-mining) land use(check one): <br /> Cropland (CR) 01 Pastureland(PL) General Agriculture (GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential (RS) Recreation(RC) Industrial/Commercial (IC) <br /> 2) Please provide a general description of how the mined area will be Reclaimed: <br /> Please see comments provided in Exhibit C-Question 17, and Question 11 of this Section and <br /> elsewhere in this application. lust needed more space than what's available here. <br /> 3) What will the final grade of the reclaimed slopes(Horizontal:Vertical): H: V <br /> (Note: If the Applicant proposes slopes steeper than 3H: IV(example 1H:1 V, 2H: IV,etc.),please <br /> include a justification: <br /> Please see the Mine Plan Map for elevation points. The area is nearly flat and will remain that way. <br /> Tharp is a 1 -2 font differpnrp in altitudp hptwppn Pnints A_ R,C 9 D_ Slope orgradp is+ -A <br /> a. Please provide a general description of the backfilling and grading: f <br /> We'll use the same long handle shovels to replace the dirt and long-handle rakes to buyr the grass <br /> ,Pp- Thpn rnmprecs it hit <br /> 4) De th of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches 6-8 inches <br /> 8-10 inches 10-12 inches <br /> Other: <br /> ✓ N/A, explain: Thi, unknewn at this fime. I'mguessing about on aveFage. All of it ill be <br /> rpplarpd in the holy it ramp from_ No waste or unused topsoil_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.