Laserfiche WebLink
16)Please provide an estimate of the actual costs to reclaim the site based on what it would <br /> cost the State of Colorado using an independent contractor to complete reclamation. The <br /> Office adds up to an additional maximum eighteen and one half(18.5%) percent of that <br /> total,which includes a private contract,typical overhead costs and profit. <br /> Direct Cost: <br /> i. Backfilling: - 7 (cubic yards)X$ / (cost per yard)=Total$ <br /> ii. Grading: 76? (cubic yards)X$ (cost per yard)=Total $ <br /> iii. Topsoil: _ (cubic yards)X$ (cost per yard)=Total$ <br /> iv. Seeding: •0 (acres)X$ (cost per acre)=Total$ <br /> v. Mobilization: (Pieces of equipment)X $ (cost per equipment)_ <br /> Total$ 1 S` <br /> Direct Cost Subtotal: $ A� ZC) <br /> Division's total overhead cost: X 18.5% <br /> Division's Total cost: $ SJ®y <br /> Note: Based on the Division's experience the required financial warranty is normally set at <br /> approximately$2,500 per acre. Therefore,a typical 5 acre permit will have a total required financial <br /> warranty in the amount of$12,500. <br />