My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-18_PERMIT FILE - M2019050 (6)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019050
>
2019-09-18_PERMIT FILE - M2019050 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 3:52:04 AM
Creation date
9/18/2019 3:54:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019050
IBM Index Class Name
Permit File
Doc Date
9/18/2019
Doc Name
Application
From
Robert & Lauren Berry
To
DRMS
Email Name
ERR
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C-Mining Plan <br /> Rule 6.3.3 (Starts on Page 136 of the Rules) <br /> The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br /> operation. The plan must be correlated to Exhibit E—Map. <br /> 1) Estimated dates of commencement: Upon approv and completion: 10/31/2021 <br /> 2) How many years is the mine anticipated to be operational: 2 years <br /> 3) Will mining activities occur all-yearlong or just seasonally when weather permits (check one): <br /> (f]) all-yearlong or(2b seasonally,explain: Given the altitude, no activity during winter. <br /> 4) How many aces of the mine site will be disturbed at any given time: 5'x5'= .0006 acres <br /> 5) De th of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches 6-8 inches <br /> 8-10 inches 1110-12 inches <br /> Other: <br /> N/A, explain: This is unknown at this time. I'm guessing it's about 18" on average. <br /> 6) Will you need to move any overburden (check one): (1::[)Yes or(_E)No <br /> a. If yes,approximately how thick is the overburden? feet <br /> 7) How will the mine be accessed: (2) existing roads (0) new roads will be created <br /> Please describe the existing roads: <br /> a. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements: <br /> 8) Will water be needed during the mining operation (check one): (J::]j Yes or( ✓)No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> operation: <br /> 9) Will any water diversions or impoundments be constructed (check one): (_D)Yes or( [�No <br /> a. If yes,please describe the water diversions or impoundments: <br /> 10)Will any chemicals be used during the mining process(check one): (J:] )Yes or( Z)No <br /> a. If yes, please describe the chemical types and quantities to be utilized,chemical storage and <br /> spill containment and emergency response plans for on-site spills. Plant operation details <br /> should include tank capacities and operating solution volumes: <br />
The URL can be used to link to this page
Your browser does not support the video tag.