My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-18_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2019-09-18_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:02:35 PM
Creation date
9/18/2019 9:23:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
9/18/2019
Doc Name
Reclamation Cost Estimate
From
GCC Energy, LLC
To
DRMS
Type & Sequence
TR27
Email Name
RDZ
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task#000 Page 4 of 13 <br /> Truck Maneuver and Dump 0.90 Minutes Adjusted for site altitude: 0.900 Minutes <br /> Time: <br /> Truck Travel(Haul&Return)Time: Road Condition:Rutted dirt,little maintenance,no water,2"tire <br /> penetration 5.0 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 3960.00 1.00 5.00 6.00 1855 2.181 <br /> 2 3960.00 -7.00 5.00 -2.00 2938 1.390 <br /> Haul Time: 3.571 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 3960.00 7.00 5.00 12.00 1440 2.756 <br /> 2 3960.00 -1.00 5.00 4.00 2849 1.401 <br /> Return Time: 4.157 minutes <br /> Total Truck Cycle Time: 10.093 minutes <br /> Loading Tool unit <br /> Production 467.20 LCY/Hour Adjusted for job efficiency: 387.78 LCY/Hour <br /> Truck Unit Production <br /> 67.81 LCY/Hour Adjusted for job efficiency: 56.29 LCY/Hour <br /> Optimal No.of Trucks: 7 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 112.57 LCY/Hour <br /> Adjusted single truck/loader team production: 112.57 LCY/Hour <br /> Adjusted multiple truck/loader team production: 112.57 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 152.37 Hours <br /> Unit cost: $2.068 /LCY Total job cost: $359476 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.