My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-18_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2019-09-18_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:02:35 PM
Creation date
9/18/2019 9:23:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
9/18/2019
Doc Name
Reclamation Cost Estimate
From
GCC Energy, LLC
To
DRMS
Type & Sequence
TR27
Email Name
RDZ
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task#000 Page 2 of 13 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: King I-Haul cover material to Waste Bank Expansion <br /> Site: King Coal Mine Permit Action: TR27 Permit/Job#: C1981035 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 9/16/2019 County: La Plata Filename: C035-001 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per daX <br /> Equipment Description <br /> Truck Loader Team-Truck: Generic 10-12 cy,6x4 <br /> -Loader: CAT 93 8H <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 100 NA NA NA NA <br /> Ownership cost/hour: $19.51 $26.49 NA NA NA NA <br /> Operating cost/hour: $46.51 $33.66 NA NA NA NA <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own. NA $0.00 NA NA NA NA <br /> cost/hour: <br /> Ripper op.cost/hour: NA $0.00 NA NA NA NA <br /> Operator cost/hour: $0.00 $40.65 NA NA NA NA <br /> Unit Subtotals: $66.02 $100.79 NA NA NA NA <br /> Number of Units: 2 1 0 0 0 0 <br /> Group Subtotals: Work: $232.83 Support: $0.00 Maint: $0.00 <br /> Total work team cost/hour: $232.83 <br /> MATERIAL QUANTITIES <br /> Initial volume: 141723 CCY Swell factor: 1.165 <br /> Loose volume: 17,152 LCY <br /> Source of estimated volume: 2.6 acres x 6"depth <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity: <br /> Truck Payload(weight)Basis: <br /> Material weight: 2,900 Pounds/LCY <br /> Description: Decomposed rock-50%Rock,50%Earth <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.