Laserfiche WebLink
Cost Summary Worksheet Cont'd Task#000 Page 7 of 13 <br /> Truck Travel(Haul&Return)Time: Road Condition: Rutted dirt,little maintenance,no water,2"tire <br /> penetration 5.0 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 2000.00 -10.00 5.00 -5.00 2938 0.732 <br /> Haul Time: 0.732 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 2000.00 10.00 5.00 15.00 1178 1.702 <br /> Return Time: 1.702 minutes <br /> Total Truck Cycle Time: 4.719 minutes <br /> Loading Tool unit <br /> Production 494.19 LCY/Hour Adjusted for job efficiency: 410.18 LCY/Hour <br /> Truck Unit Production <br /> 145.04 LCY/Hour Adjusted for j ob efficiency: 120.38 LCY/Hour <br /> Optimal No.of Trucks: 3 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 240.77 LCY/Hour <br /> Adjusted single truck/loader team production: 240.77 LCY/Hour <br /> Adjusted multiple truck/loader team production: 240.77 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 10.35 Hours <br /> Unit cost: $0.967 /LCY Total job cost: $29410 <br /> CIRCES Cost Estimating Software <br />