Laserfiche WebLink
this pumping test, since all of the underground mine workings where water is stored are located <br /> on patented mining claims owned by CMC. <br /> c. Please be advised, submittal of the requested mine pool drawdown plan will be a stipulation <br /> of AMO 1 approval, requiring this plan be submitted in the form of a Technical Revision for <br /> Division review and approval, prior to mill operations commencing at the site. Please <br /> acknowledge your acceptance of this stipulation. <br /> CMC Response: CMC acknowledges that a mine pool drawdown plan will be a stipulation of <br /> Revision AM 01 approval,requiring that this plan be submitted in the form of a Technical Revision <br /> for DRMS review and approval,prior to milling operations commencing at the Gold Hill Millsite. <br /> 2) The operator's response to Item no. 1(d) states the operator is awaiting the results of the <br /> Deere & Ault's mine pool control plan and monitoring plan to determine if it is necessary to <br /> maintain the water levels in the mine workings below the design standard for the Times Mine <br /> Bulkhead. <br /> Please be advised, until the Division has reviewed and approved the new engineer bulkhead <br /> evaluation based on the results of the proposed pumping test, and including different <br /> recommendations than those included in the evaluation submitted to the Division on May 17, <br /> 2019, the operator must commit to maintaining water levels in the mine workings below the <br /> design standard for the bulkhead, 17.6 feet of head or an elevation of 8,360 feet during <br /> operations, including weekly monitoring of water levels. <br /> CMC Response: CMC commits to maintaining water levels in the mine workings at an elevation <br /> of 8,360 feet during operations until the DRMS has reviewed and approved the new bulkhead <br /> evaluation based on the results of the proposed pumping test, which may include different <br /> recommendations than those included in the Deere & Ault Consultants evaluation of the Times <br /> Mine Bulkhead submitted on May 17,2019. CMC commits to conduct weekly monitoring of water <br /> levels during operations. <br /> 3) The operator's response to Item no. 1(e) states the operator is awaiting the results of the Deer <br /> & Ault's mine pool control plan and monitoring plan to determine the actual Times Mine <br /> Bulkhead pressure and the effects of different water levels in the Times and Wynona Mines on <br /> the bulkhead pressure. <br /> Please be advised, until the Division has reviewed and approved the new engineer bulkhead <br /> evaluation based on the results of the proposed pumping test, and including different <br /> recommendations than those included in the evaluation submitted to the Division on May 17, <br /> 2019, the operator must commit to maintaining the bulkhead pressure below the design standard <br /> 3 <br />