Laserfiche WebLink
Area Description Acres Phase III Phase 11 Released <br /> With <br /> 91 North Decline 6.6 acres SL-08 (2015) <br /> 92 Borrow Area 1.1 acres SL-08 (2015) <br /> 93 Substation B 0.3 acres SL-08 (2015) <br /> 94 Conveyor Corridor 0.3 acres SL-11 (2019) <br /> 95 Substation A 0.2 acres SL-11 (2019) <br /> 96 Light Use Road 91 1.9 acres SL-11 (2019) <br /> 97 Affected Area 291.3 acres No Surface <br /> Disturbance <br /> Associated <br /> Total 301.7 acres <br /> Summary and Conclusions <br /> Based upon a review of the mine permit,the applicant's bond release application, and site inspections, <br /> the Division finds that Snowcap Coal Company, Inc. has successfully completed all surface coal <br /> mining reclamation operations in accordance with the approved reclamation plan and met all <br /> requirements of the Act and Rules on the 301.7 acres requested for final release in this SL-11 <br /> application. <br /> IV. PROPOSED DECISION <br /> Based on the observations above, the Division proposes to approve Snowcap Coal Company, Inc.'s <br /> request for a partial Phase II and partial Phase III bond release for the Roadside Portals. This proposed <br /> decision will release the applicant from liability for all reclamation work conducted on the 301.7 acres <br /> at the Roadside Portals Mine <br /> PHASE III <br /> The original performance bond for the Roadside Portals was $1,500,000.00. The Reclamation <br /> Liability prior to any bond release approvals was $3,264,149.00 (8/8/2002). A summary of bond <br /> releases previously approved by the Division is included in the following table: <br /> Permitting Action Description Change to Reclamation Liability <br /> SR1 Approved 7/27/2001 Reclamation Cost Liability $3,244,980.00 <br /> Adjusted <br /> SL-1 12/14/2001 Withdrawn NA NA <br /> SL-2 8/15/2003 Approved Phase I release of 13 acres $1,466,510.00 <br /> SL-3 10/31/2007 Approved Liability release of 7,098, 2,140 No$ released <br /> affected acres, and 4.7 <br /> disturbed acres overlying <br /> underground workings <br /> SL-4 12/5/2008 Approved Phase 1 18.0 acres $587,007.00 <br /> SL-5 9/9/2009 Approved Phase 112.1 acres $10,174.00 <br /> Phase 111 2.1 acres <br /> 10 <br />