My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-16_REVISION - M1980244 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-09-16_REVISION - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:01:37 PM
Creation date
9/16/2019 3:00:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
9/16/2019
Doc Name
Adequacy Review Response
From
CC&V
To
DRMS
Type & Sequence
TR116
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEWMONT <br /> GOLDCORP <br /> identifier from the application text, e.g. "Figure 2'7, date and a north arrow <br /> shall be included. <br /> Each figure in part in the TR-116 submittal does not conform to the standard in Rule <br /> 6.2.1(2). <br /> i. Please resubmit Figures 2 and 3 with the signature of the qualified person (ref. <br /> 1(b) above). <br /> ii. Please resubmit Figures 2 and 3 to include "Figure 2" and "Figure 3"' <br /> respectively in the title block (ref. 1(d) and (e) above). Note: during the DRMS <br /> scanning and review process, pages may become rearranged from the order <br /> in which they were submitted. <br /> iii. Figure 1: Figure 2 is a cross-section for which there is no reference as to where <br /> this section occurs. Figure 3 shows the location of proposed facilities using the <br /> local mine coordinates (not included on Figure 1), but it is difficult to determine <br /> from Figure 3 where the facilities are proposed in the Main Cresson Pit. <br /> Showing the location of the Figure 2 cross-section and the five proposed Figure <br /> 3 facilities on Figure 1 would help identify the locations of each. Please <br /> resubmit Figure 1 with these locations, or provide an additional figure meeting <br /> the requirements of Rule 6.2.1(2) showing the location of the cross-section and <br /> the five proposed facilities with respect to the Main Cresson Pit as a whole (ref. <br /> 1(d) above). <br /> iv. Figure 2 Legend: Figure 2 identifies the colored lines (VLF 1 liner, VLF 2 liner <br /> and the Phase 3 exploration drift). But does not identify the black/gray line. <br /> Each number on the vertical axis includes an "U, which is not defined. Please <br /> resubmit Figure 2 with either a legend or a call-out for the black/gray line and <br /> identifying the "L"(ref. 1(e) above). <br /> Figures 1, 2 and 3 have been updated to meet all requirements and are <br /> enclosed within this response. <br /> 2) Table 1: Table 1 indicates an additional 432,000 tons are to be mined. Will this <br /> material be placed on the valley leach facilities, overburden storage areas, or both? <br /> How does this additional material impact the approved footprint height and <br /> configuration of these facilities? <br /> Material from the proposed project will be utilized as backfill within any of <br /> the previously approved open pits or placed in an approved overburden <br /> storage area on site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.