Laserfiche WebLink
PERMIT#:M-1977-493 <br /> INSPECTOR'S INITIALS: ECS <br /> INSPECTION DATE: September 11,2019 <br /> PHOTOGRAPHS <br /> ti <br /> Photo 1 —contractor(Kumar&Assoc.)conducting QA/QC Photo 2—Waste rock at entrance to Mayflower Bypass <br /> testing on shotcrete to be used in Mayflower Bypass Tunnel extension prior to hauling to spoil are approved in <br /> extension. TR30. <br /> - <br /> r - <br /> Photo 3—ground stabilization(shotcrete,bolts,wire)being Photo 4—PWDTP sludge disposal cell after expansion <br /> placed near working face in Mayflower Bypass extension. (raising berm)as detailed in TR29. <br /> .., <br /> k <br /> Photo 5—Topsoil stockpile area and sediment control berm Photo 6—contractor installing contact water collection lines <br /> at toe of McNulty Gulch WSF expansion. C1 and C2 for McNulty WSF expansion project. <br /> Page 3 of 3 <br />