My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-12_INSPECTION - C1996083
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996083
>
2019-09-12_INSPECTION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:00:51 PM
Creation date
9/16/2019 7:56:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Date
9/12/2019
Doc Name
Inspection Report
From
DRMS
To
Bowie Resources, LLC
Inspection Date
9/10/2019
Email Name
RDZ
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 10,2019 G1996-083/Bowie No. 2 Mine HBR <br /> ROADS—Rule 4.03 <br /> Construction 4.03.1(3)/4.03.2(3),Drainage 4.03.1(4)/4.03.2(4), Surfacing and Maintenance4.03.1(5)and <br /> (6)/4.03.2(5) and(6), Reclamation 4.03.1(7)/4.03.2(7): <br /> No problems were seen with roads or the steep hillsides above the road to the portals. In particular,the hillside <br /> above Curve 8, which is armored with boulders, is stable. <br /> SLIDES and DAMAGE -Rule 4.12: <br /> Due to the angle of the photos(looking down the hill towards the river and highway)the slumps by the B Portal <br /> and by Curve 11 were not inspected. <br /> SUPPORT FACILITIES - Rule 4.04: <br /> No problems were identified with any facility areas. This includes all of the areas along the road to the portals and <br /> the Explosives Storage pad. <br /> TOPSOIL—Rule 4.06 <br /> Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br /> Two topsoil stockpiles (one by the material storage on the road to the portals and one by Gob Pile#3)appear to be <br /> in good shape. That is,they appear stable and well covered with vegetation. <br /> The coverfill piles (one next to Gob Pile#2 and one next to Gob Pile#3) appear to be in good shape. <br /> DOCUMENTS RECEIVED-None <br /> OTHER(SPECIFY)-None <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 3 <br /> Number of Complete Inspections this Fiscal Year: 0 <br /> Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.