Two lined ponds will support the processing facilities. One will contain process water from the sand wash <br /> processing plant and will be recycled to feed the process water tank.The second pond will be used for temporary <br /> storage of slurry from the sand wash processing plant, as necessary.The ponds will be located adjacent to each <br /> other, lined with HDPE liners, and will be constructed at grade. Both ponds will be approximately 0.5 acres in <br /> area,with a depth of no more than 10 feet.They will be capable of handling approximately 1.6 million gallons <br /> each. Safety berms will surround each pond. <br /> Construction and operations will be conducted with a Spill Prevention Control &Countermeasure (SPCC) Plan as <br /> well as Storm Water Pollution Prevention Plan (SWPPP). Please refer to Exhibit G for more water information. <br /> 6.4.4. (d)Size of Area -The processing facility(approximately 45 acres)will be in use the entire life of the <br /> operation.As shown on Map D1, Mining Plan Map,the mining area has been outlined to show the approximate <br /> yearly mining blocks for the first 10 years and the sequence of additional 10-year mining blocks over the mine's <br /> 35-year life. Each yearly block will be mined sequentially,with concurrent backfilling as operations progress.As <br /> a pit backfill is completed, it will be regraded and reclaimed in accordance with reclamation plans.At any given <br /> time, only one block will be actively mined. It is estimated each highwall will take approximately 3 years to <br /> regrade and reclaim. With the concurrent reclamation, it is not anticipated that the entire area of any block <br /> would be disturbed at any given time,since backfilling will occur simultaneously with active mining area of the <br /> pit. <br /> 6.4.4. (e)Approximate Timetable- For the purposes of discussion,this section is divided into 3 phases- <br /> construction, operations, and reclamation. <br /> Construction <br /> The construction stage will include the installation of all sand wash processing plant facilities,facility road <br /> installation and existing road upgrades, and installation of all utilities necessary for sand wash processing plant <br /> operations. See Figure D3,Site Plan,for details.This stage will also include the construction of the temporary <br /> sediment basin to be used for construction stormwater management.The construction stage is estimated to <br /> take approximately 8-12 months to complete. <br /> A Construction Stormwater General Permit will be obtained from CDPHE and a Stormwater Management Plan <br /> and associated Erosion Control Map will be prepared for the construction areas.Appropriate erosion control <br /> BM Ps will be installed at each area of the project where construction activities will occur prior to any land <br /> disturbing activities and will be maintained throughout the construction stage. Once construction activities are <br /> complete and all impervious surface areas are installed,temporary BMPs will be removed. No landscaping is <br /> currently planned.All stormwater runoff will be directed to the onsite temporary sediment basin;the facility <br /> will not be connected to an external sewer drain system. <br /> Facilities <br /> The processing facility area is approximately 45 acres and access will be located off WCR 91 at approximately <br /> 40° 14'49.00" N and 104°12'24.50"W. It will include approximately 2,800 linear feet(3.0 acres) of paved road <br /> and 1.3 acres of impervious surface for parking areas.The remainder of the facility will be used for constructed <br /> buildings and associated facilities or left as native vegetation buffer areas.The mine pits have been designed <br /> more than 200 feet from the edge of the facilities area boundary(buffer areas).This facilities buffer area will <br /> consist of undisturbed native vegetation areas that stormwater runoff will be directed to and/or discharged to <br /> from the settling pond, as needed. <br /> The sand wash processing plant will consist of a plant feed stockpile,scrubbing, cyclonic separation, product <br /> dewatering,fines thickener,fines dewatering, a process water storage tank, process water pond, slurry pond, <br /> 7 <br />