Laserfiche WebLink
finalized.The nearby mine pits have been designed at least 200 feet from the edge of the right-of-way of WCR <br /> 91,which is 60 feet. <br /> A new paved access road will be built from WCR 91 to the facilities for truck and employee access to the site. <br /> This approximately 1,900 linear foot long access road will include a paved 3-lane truck loadout, check-in booth, <br /> truck hatch opening and closing stations, and access to the parking lot for the office building.The access road <br /> has been designed to include an access gate that is no less than 35 feet from the edge of the traveled surface <br /> and at least 300 feet of asphalt or concrete pavement prior to the edge of the traveled surface for access and <br /> tracking control, as required by Weld County.An Access Permit and Right-of-Way(ROW) Use Permit will be <br /> obtained from Weld County prior to building this access road as part of the building permit package. <br /> Temporary dirt haul roads will be built and reclaimed as needed throughout the life of the mine. Figure D5 <br /> shows a typical haul road cross section. <br /> 9 <br />