Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Cost Summary of Reclamation Tasks <br /> Permit Action: 2015 <br /> Reclamation <br /> Site: Bennett Pit Cost Estimate Permit/Job",: M2007021 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 3/2i2015 County: Yuma _ Filename: M021-000 <br /> User: ERR <br /> Agency or organization name: _DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used _ Size Hours Cost <br /> 001 BackfiII &Grade to 3H,I V SIo es DOZER I 1 35.45 $7,698.00 <br /> 002 Replace Topsoil SCRAPERI 1 9.15 $4 277.00 <br /> 003 Reve etate the Site REVEGE 1 6.00 $6.663.00 <br /> 004 Mobilization/Demobilization of Reclamation MOBILIZE 1 4.55 $4,514.00 <br /> Equipment <br /> SUBTOTALS: 55.15 $23,152 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02% Total= $467.67 <br /> Performance bond: 1.05% Total= $243.10 <br /> Job superintendent: 0.00 hrs Total= $0.00 <br /> Profit- 10 00% Total= $2.315.20 <br /> TOTAL 0&P= $3,025.97 <br /> CONTRACT AMOUNT(direct+O&P)_ $26,177.97 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 500.00 _ Total= 500.00 <br /> Engineering work and/or contract/bid preparation: 0.00% Total= $0.00 <br /> Reclamation management and/or administration: 5.00% $1,308.90 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $4.834.87 <br /> TOTAL(direct indirect)= $27,986.87 <br /> TOTAL BOND AMOUNT(rounded)= $28,000.00 <br />