Laserfiche WebLink
September 10,2019 C-1996-084/Lorencito Canyon Mine HBR <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> NA -Air Resource Protection R -Roads <br /> N -Availability of Records R -Reclamation Success <br /> NA -Backfill&Grading R -Revegetation <br /> R -Excess Spoil and Dev. Waste NA - Subsidence <br /> NA -Explosives Y - Slides and Other Damage <br /> N -Fish&Wildlife NA - Support Facilities On-site <br /> R -Hydrologic Balance N - Signs and Markers <br /> Y -Gen. Compliance With Mine Plan NA - Support Facilities Not On-site <br /> N -Other N - Special Categories Of Mining <br /> NA -Processing Waste N -Topsoil <br /> COMMENTS <br /> The Lorencito Canyon Mine was photographed from an airplane by Harry Ranney of DRMS on Sept 10, 2019. <br /> These photos were reviewed by Harry Ranney of DBMS on Sept 11, 2019. The weather was clear. <br /> EXCESS SPOIL and DEVELOPMENT WASTE—Rule 4.09 <br /> Placement; Drainage Control; Surface Stabilization: <br /> No large rills or other problems were identified with Fills 7, 8, or 9. <br /> HYDROLOGIC BALANCE -Rule 4.05 <br /> Drainage Control 4.05.1,4.05.2,4.05.3; Siltation Structures 4.05.5,4.05.6; Discharge Structures 4.05.7, 4.05.10; <br /> Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br /> Drainage—Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> Ponds 6, 71 8, and 9A were inspected. Pond 6 & 9A contained substantial amounts of water.No issues were <br /> identified with embankments or spillways. <br /> No erosion problems or other issues were identified with any ditches. Check dams in ditches (D5, D8, D9,D64, <br /> and D71)also appeared to be functioning well. <br /> ROADS—Rule 4.03 <br /> Construction 4.03.1(3)/4.03.2(3),Drainage 4.03.1(4)/4.03.2(4), Surfacing and Maintenance4.03.1(5) and <br /> (6)/4.03.2(5) and(6), Reclamation 4.03.1(7)/4.03.2(7): <br /> No problems with roads were identified. <br /> Number of Partial Inspection this Fiscal Year: 2 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 2 of 4 <br />