Laserfiche WebLink
Rocky Ford East Pit, Permit No. M-1977-560, Technical Revision <br /> Adequacy Review No. 1 Answers <br /> vii. Total Reclamation cost estimate: <br /> Mobilization Etc. $ 60,000.00 <br /> Borrow and Fill $494,700.00 <br /> Ripping $ 4,000.00 <br /> Topsoil $ 74,000.00 <br /> Revegetation $ 73,000.00 <br /> Dewatering $ 40,000.00 <br /> TOTAL $745,700.00 <br />