Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Reclaim Ditch CWD-1 <br /> Site: Colowyo Coal Mine Permit Action: MR202 Permit/Job#: C1981019 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 5/10/2019 County: Moffat Filename: C019-000 <br /> User: ZTT <br /> Agency or organization name: DBMS <br /> TASK LIST(DIRECT COSTS) <br /> Form Fleet Task <br /> Task Description Used Size Hours Cost <br /> 001 Regrade Ditch CWD-1 DOZER 1 12.95 $2,415 <br /> 002 Regrade Topsoil for Ditch CWD-1 DOZER 1 5.50 $2,670 <br /> 003 Reseed Ditch CWD-1 REVEGE 1 4.30 $1,202 <br /> SUBTOTALS: 22.75 $6,287 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $127 <br /> Performance bond: 1.05 Total= $66 <br /> Job superintendent: 13.09 Total= $956 <br /> Profit: 10.00 Total= $629 <br /> TOTAL O&P= $1,778 <br /> CONTRACT AMOUNT(direct+O&P)= $8,065 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $0 Total= $0 <br /> Engineering work and/or contract/bid preparation: 2.00 Total= $161 <br /> Reclamation management and/or administration: 1.91 $154 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $2,093 <br /> TOTAL BOND AMOUNT(direct+indirect)= $8,380 <br />