My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-31_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2019-05-31_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 7:13:17 AM
Creation date
9/11/2019 10:05:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
5/31/2019
Doc Name
Cumulative Bond Schedule
Section_Exhibit Name
Exhibit 13C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Remove Power Lines at Collom Haul Road <br /> Site: Colowyo Coal Mine Permit Action: MR192 Permit/Job#: C1981019 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 10/10/2018 County: Moffat Filename: CO 19-000 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> TASK LIST (DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Remove Power Lines at Collom Haul Road DEMOLISH 1 24.00 $826.58 <br /> SUBTOTALS: 24 $827 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $16.71 <br /> Performance bond: 1.05 Total= $8.68 <br /> Job superintendent: 12.00 Total= $876.60 <br /> Profit: 10.00 Total= $82.70 <br /> TOTAL O&P= $984.69 <br /> CONTRACT AMOUNT(direct+O&P)= $1,811.69 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 0.00 Total= 0.00 <br /> Engineering work and/or contractibid preparation: 2.00 Total= $36.23 <br /> Reclamation management and/or administration: 1.91 $34.60 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $1,055.53 <br /> TOTAL BOND AMOUNT(direct+indirect)= $1,882.53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.