My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-31_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2019-05-31_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 7:13:17 AM
Creation date
9/11/2019 10:05:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
5/31/2019
Doc Name
Cumulative Bond Schedule
Section_Exhibit Name
Exhibit 13C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Reclaim Disturbance Associated w/TR-121 <br />Site: Colowyo Coal Mine Permit Action: TR121 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 8/10/2018 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: C019-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />Demolish Task Associated w/TR-121 <br />DEMOLISH <br />1 <br />1 <br />1 <br />40.00 <br />$8,341.86 <br />$5,617.00 <br />$17,948.00 <br />Regrade Topsoil for TR -121 DOZER <br />11.58 <br />Reseed 14.7 acres for TR -121 REVEGE <br />7.30 <br />CONTRACT AMOUNT (direct + O & P) = <br />$38,227.83 <br />SUBTOTALS: <br />58.88 <br />$31,907 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02 <br />Total = <br />$644.52 <br />1.05 <br />Total = <br />$335.02 <br />29.44 <br />Total = <br />$2,150.59 <br />10.00 <br />Total = <br />$3,190.70 <br />TOTAL O & P = <br />$6,320.83 <br />CONTRACT AMOUNT (direct + O & P) = <br />$38,227.83 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 <br />Engineering work and/or contract/bid preparation: 2.00 <br />Reclamation management and/or administration: 1.91 <br />Total = 0.00 <br />Total = $764.56 <br />$730.15 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $7,815.54 <br />TOTAL BOND AMOUNT (direct + indirect) = $39,722.54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.