Laserfiche WebLink
BULLDOZER WORK <br />Taskdescription: RegradeTopsoil for West Side Pond Access Road <br />Site: Colowyo Coal NEne <br />PROJECT IDENTIFICATION <br />Task#: 037 <br />Date: 5/16/2018 <br />User: ZTT <br />Permit Action: 13C (RN7) <br />Page 76 of 115 <br />Permit/Job#: C1981019 <br />State: Colorado Abbreviation: None <br />County: Moffat Filename: C <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />DRMS <br />Basic Machine: <br />CatDllT - 11U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 perday <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripperown. <br />Cost/Hour: <br />Ripperop. Cost/Hour: <br />Operator Cost/Hour: <br />$226.13 <br />Utilization % <br />NA <br />$183.90 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />Total unit Cost/Hour: $451.88 <br />Total Fleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,688 <br />Swell factor: 1.000 <br />Loose volume: 2,688 LCY <br />Source ofestimatedvolume: Exhibit 7-23B, Table 1, Fxh. 7 -item 23, Fig. B-1 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Averagepush dis tance: <br />Unadjusted hourly <br />production: <br />200 feet <br />1,560.0 LCY/hr <br />Materials consistency description: Compacted fill orembankment 0.9 <br />Averagepush <br />gradient: <br />Average s ite altitude: <br />Materialweight: <br />5% <br />7,500 feet <br />2,550 lbs/LCY <br />Weight description: Earth - Dry packed <br />CIRCES Cost Estimating Solware <br />