Laserfiche WebLink
Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />AVG. <br />Material consistency: <br />0.900 <br />CAT HB <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />0.800 <br />(POOR) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />0.800 <br />(FND-RF) <br />Push gradient: <br />1.329 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />MaterialWeight: <br />0.868 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.4136 <br />Adjustedunit <br />production: <br />Adjustedfleet <br />production: <br />JOB TIME AND COST <br />1,020.52 LCY/hr <br />1020.52 LCY/hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.443/LCY <br />Totaljob time: 15.80 Hours <br />Totaljob cost: $7,141 <br />Page 51 of 115 <br />CIRCES Cost Estimating SoSware <br />