My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-31_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2019-05-31_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2019 10:10:03 AM
Creation date
9/11/2019 9:50:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
5/31/2019
Doc Name
Cumulative Bond Schedule
Section_Exhibit Name
Exhibit 13C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck Travel (Haul & Return) Time: <br />maintained 2.0 <br />Haul Route - <br />Page 35 of 115 <br />Road Condition: Hard, smooth, stabilized, surfaced, watered, <br />Seg # <br />HaulDistance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />Production <br />(%) <br />(%) <br />(fpm) <br />Time <br />(fpm) Time <br />min <br />938.34 LEY/Hour Adjustedforjob efficiency: <br />778.82 LEY/Hour <br />1 <br />6500.00 <br />min <br />1 <br />6500.00 <br />5.00 <br />2.00 <br />7.00 <br />1160 <br />5.791 <br />HaulTime: 5.791 minutes <br />Retnrn Rnute- <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unitcost: $1.291 /LCY <br />Totaljob time: 118.19 Hours <br />Totaljob cost: $475,186 <br />C[RCES Cost Estimating Software <br />Seg # <br />HaulDistance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity rave <br />Production <br />(Ft) <br />3,820.87 LCY/Hour <br />(%) <br />(%) <br />(fpm) Time <br />min <br />938.34 LEY/Hour Adjustedforjob efficiency: <br />778.82 LEY/Hour <br />1 <br />6500.00 <br />-5.00 <br />2.00 <br />-3.00 <br />3503 1.913 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unitcost: $1.291 /LCY <br />Totaljob time: 118.19 Hours <br />Totaljob cost: $475,186 <br />C[RCES Cost Estimating Software <br />Return Time: 1.913 <br />minutes <br />Total Truck Cycle Time: 11.184 <br />minutes <br />Loading Toolunit <br />Production <br />4,603.46 LCY/Hour Adjustedforjob efficiency: <br />3,820.87 LCY/Hour <br />TruckUnit Production <br />938.34 LEY/Hour Adjustedforjob efficiency: <br />778.82 LEY/Hour <br />Optimal No. ofTrucks: <br />5 Truck(s) Selected NumberofTrucks: <br />4 Truck(s) <br />Adjustedhourlytruckteamproduction: 3,115.29 <br />LCY/Hour <br />Adjustedsingletruck/loaderteamproduction: 3,115.29 <br />LCY/Hour <br />Adjustedmultipletruck/loaderteamproduction: 3,115.29 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unitcost: $1.291 /LCY <br />Totaljob time: 118.19 Hours <br />Totaljob cost: $475,186 <br />C[RCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.