Laserfiche WebLink
Page 33 of 115 <br />TRUCK/LOADER TEAM WORK <br />Task description: Load/Haul/Regrade Topsoil to Collom Facilityfrom TS 25A <br />Site: Colowyo Coal Mine Permit Action: 13C (RN7) Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task#: 016 State: Colorado <br />Date: 5/16/2018 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Abbreviation: None <br />Filename: C019-016 <br />Shift basis :112er day <br />CnstRreakdnwn: Truck/1nader Team <br />Sunnort Fouinment Maintenance Fnuinment <br />Total work team cost/hour: $4.020.61 <br />Initial volume: 327,278 CCY Swell factor: 1.125 <br />Loosevolume: 368,188 LCY <br />Source ofestimatedvolume: Division ofReclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Pavload(weig_ht) Basis: <br />Material weight: 2,550 <br />Description: Earth - <br />Rated Payload: 492,20, <br />Pounds/LCY <br />CIRCES Cost Estimating SoSware <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />WaterTruck <br />%Utilization -machine: <br />100 <br />100 <br />100 <br />100 <br />50 <br />50 <br />Ownership cost/hour: <br />$186.73 <br />$354.06 <br />$226.13 <br />$226.13 <br />$72.40 <br />$74.07 <br />Operating cost/hour: <br />$186.98 <br />$367.13 <br />$183.90 <br />$183.90 <br />$28.99 <br />$54.40 <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripperown. cost/hour. <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$31.90 <br />1 $41.20 <br />$41.85 <br />$41.85 <br />$28.90 <br />$21.39 <br />Unit Subtotals: <br />$405.61 <br />$762.39 <br />$451.88 <br />$451.88 <br />$130.28 <br />$149.86 <br />Number of Units: <br />4 <br />1 <br />1 <br />2 <br />1 <br />1 <br />Group Subtotals: <br />Work <br />$2,384.83 <br />Support: <br />$1,355.64 <br />Maint: <br />$280.14 <br />Total work team cost/hour: $4.020.61 <br />Initial volume: 327,278 CCY Swell factor: 1.125 <br />Loosevolume: 368,188 LCY <br />Source ofestimatedvolume: Division ofReclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Pavload(weig_ht) Basis: <br />Material weight: 2,550 <br />Description: Earth - <br />Rated Payload: 492,20, <br />Pounds/LCY <br />CIRCES Cost Estimating SoSware <br />