Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />beraper I rusn>vozer I bource <br />Altitude Ad: 1 1.000 1 NA I (CAT HB <br />Job Efficiencv: 1 0.830 1 NA I (CAT HIO <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Hard, smooth, stabilized, surface& watered. maintained 2.0 <br />HaulRnute- <br />Page 26 of 115 <br />Site Altitude: 7500 feet <br />Seg # Haul Distance (Ft) <br />Grade Roll. Res <br />(%) (%) <br />Total Res <br />(%) <br />1 <br />Velocity Trawl Time <br />(fpm) (min) <br />1 1380.00 <br />-6.00 2.00 <br />4.00 <br />2972 0.52 <br />HaulTime: 0.52 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade Roll. Res <br />Total Res <br />1 <br />Velocity <br />m <br />1 <br />Trawl Time <br />(min) <br />1 <br />1380.00 <br />6.00 1 2.00 <br />8.00 <br />1931 <br />0.80 <br />Return Time: <br />0.80 <br />minutes <br />Total Scraper teamcycle time: <br />2.92 <br />minutes <br />Adjusted forjob conditions: <br />989.18 <br />LCY/Hour <br />Selected Numberof Scrapers: <br />2 <br />Scraper(s) <br />Adjusted s ingle scraperteam(unit) hourly production: <br />989.18 <br />LCY/Hour <br />Adjusted multiple s craper team (fleet) hourly production: <br />3,956.71 <br />LCY/Hour <br />Unadjustedunitproduction/hour: 1,191.78 LCY/Hour <br />Optimal Numberof Scrapers perpush dozer: <br />JOB TIME AND COST <br />Fleet size: 4 Team(s) <br />Unitcost: $1.140 /LCY <br />Totaljobtime: 10.96 Hours <br />Totaljob cost: $49,433 <br />CIRCES Cost Estimatmg Sogwaie <br />