Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />I Altitude Adi: 1 1.000 1 NA I (CAT HB) I <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Hard, smooth, stabilized, surfaced watered maintained 2.0 <br />HaulRoute: <br />Page 24 of 115 <br />Site Altitude: 7500 feet <br />Seg # <br />Haul Distance (Ft) Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />1 <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />1 <br />2000.00 -5.75 <br />2.00 <br />-3.75 <br />2972 <br />0.72 <br />HaulTime: 0.72 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) Grade Roll. ResTotal <br />(%) (%) <br />J <br />Res <br />(% <br />Velocity <br />m <br />Trawl Time <br />(min) <br />1 <br />2000.00 5.75 2.00 <br />7.75 <br />1931 <br />1.12 <br />Return Time: 1.12 minutes <br />Total Scraper teamcycle time: 3.44 minutes <br />Adjusted forjob conditions: 839.65 LCY/Hour <br />Selected Numberof Scrapers: 2 Scraper(s) <br />Adjustedsingle scraper team(unit) hourly production: 839.65 LCY/Hour <br />Adjustedmultiplescraper team (fleet)hourly production: 3,358.60 LCY/Hour <br />Unadjustedunitproduction/hour: 1,011.63 LCY/Hour <br />Optimal Numberof Scrapers perpush dozer: <br />JOB TIME AND COST <br />Fleet size: 4 Team(s) Totaljobtime: 11.25 Hours <br />Unitcost: $1.343 /LCY Totaljobcost: $50,761 <br />CIRCES Cost Estimating Sotware <br />