Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad: 1.000 <br />NA <br />CAT HB <br />Job Efficiency: 0.830 <br />NA <br />(CAT HB) <br />Net Correction: I 0.830 I NA <br />Travel Time: <br />Road Condition: Hard, smooth, stabilized, surfaced, watered maintained 2.0 <br />Haul Route: <br />Page 22 of 115 <br />Site Altitude: 7500 feet <br />Seg # Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res Velocity <br />(%) (fpm) <br />1 <br />Trawl Time <br />(min) <br />1 1150.00 <br />-4.50 <br />2.00 <br />-2.50 2972 <br />0.45 <br />HaulTime: 0.45 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />1 <br />Velocity <br />m <br />1 <br />Traw Time <br />(min) <br />1 <br />1 <br />1150.00 <br />4.50 <br />1 2.00 <br />6.50 <br />2638 <br />0.63 <br />Return Time: 0.63 minutes <br />Total Scraper teamcycle time: 2.68 minutes <br />Adjusted forjob conditions: 1,077.76 LCY/Hour <br />Selected Numberof Scrapers: 2 Scraper(s) <br />Adjustedsingle scraper team (unit) hourly production: 1,077.76 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 4,311.04 LCY/Hour <br />Unadjustedunitproduction/hour: 1,298.51 LCY/Hour <br />O+ptimalNumberof Scrapers perpush dozer: <br />JOB TIME AND COST <br />Fleet size: 4 Team(s) Totaljob time: 6.81 <br />Unitcost: $1.047 /LCY Totaljobcost: $30,728 <br />Hours <br />CMCES Cost Estimating Sotware <br />